Gravel Compaction under Conc. Slab Floor
I plan on building a polebarn this spring. I plan on doing the base-prep myself with a box scraper and loader. I will be stripping 8”-12” of topsoil then replacing with gravel. My question is how to compact the gravel. Since I don’t have a vibratory roller handy, anyone have any suggestions on how to do this? After its compacted, I plan on placing some stone then pouring a concrete slab. Thanks.
|
|
Add Photo
Bookmarks: |
|
|
|
Gravel Compaction under Conc. Slab Floor
So I guess I should probably just have it leveled and compacted by someone with a roller. My barn will be 24x36 and I assume Ill prep a 28x40 area for it. My plan is to remove 8 to 12 inches of topsoil and replace with 12 to 14 inches of gravel. Then compact, then add 4" clean stone drained with some 4" perf. pipe, then add 5" conc slab on top. By this time I think ill be sufficiently above the surrounding grade. I dont think there is any way to avoid gravel cost. Brokenarrow.... sounds like you had the right idea but just maybe bumped it up a little to higher than you needed by maybe a foot. You could have probably gotten away with 6-12 inches on the high side rather than 2 ft., but I wouldn't regret using the gravel over the soil (assuming I understood you correctly) Thanks.
|
|
Add Photo
Bookmarks: |
|
|
|
Gravel Compaction under Conc. Slab Floor
brokenarrow, your point is well taken. You're right, but Im really at my financial limit with the barn at its current size plus the tractor i've bought to put inside. I do have a 12x18 covered-bay in addition to the barn itself. This is where I plan to store the implements. There really is not much room to manuver in the barn b/c of the middle posts... unfortunately, its not going to be clear-span (again.. too much $$). Thanks for the input.
|
|
Add Photo
Bookmarks: |
|
| |
|
Page [ 1 ] | Thread 109007 Filter by Poster: 3 | 1 | 1 | 3 |
|
()
Unanswered Questions
Active Subjects
Hot Topics
Featured Suppliers
|